DIWAI
Do It Yourself. Do It With AI.
Your AI-powered DIY assistant. Snap a photo of anything in your home and get a complete project plan with step-by-step instructions, tools, materials, costs and safety guidance.
Swipe through the full app experience.
Three powerful modes in one camera. Fix analyses problems and tells you how to repair them. Plan creates full project blueprints. Design reimagines your space with AI-generated mockups.

Describe your project in plain English or snap a photo. DIWAI generates a full plan with difficulty rating, time estimate, itemised costs, tools, materials, and safety warnings.

Every project generates a shopping list with real prices from Wickes, B&Q, Screwfix, Toolstation and more. See which store is cheapest and get directions to the nearest branch.

Photograph a broken tap, cracked tile, or faulty appliance. AI identifies the problem with confidence scoring, flags safety hazards, and generates a complete repair plan. Dangerous work is flagged with professional referrals to Gas Safe, NICEIC, and certified tradespeople.

Follow AI-generated visual instructions step by step. Each step includes tools needed, safety warnings, pro tips, and estimated duration. Use voice commands hands-free, then snap a photo to verify your work with Check My Work before moving on.

Everything you need to tackle any project with confidence.
Point your camera at a leaky tap, cracked wall, or tired room. DIWAI analyses the image and generates a full project plan instantly.
AI-powered diagnosis with confidence scoring. Identifies what's broken, flags safety concerns, and suggests repair actions with professional referrals when needed.
Visualise renovations before you start. Get three AI-generated design concepts with before & after comparisons and one-tap conversion to project plans.
Detailed lists of exactly what you need — tools, materials, quantities, and estimated costs from real retailers. Share your shopping list or compare prices.
Clear numbered steps with time estimates, AI-generated visual guides, pro tips, and per-step checklists. Follow along at your own pace.
Snap a photo of your completed step and let AI verify your work. Get quality assessment and improvement suggestions before moving on.
Four-level safety system from info to blocker. PPE recommendations, hazard warnings, building regulations, and certified professional referrals.
Hands-free operation with on-device speech recognition. Navigate steps, repeat instructions, and control your workflow entirely by voice.
Find 15 types of suppliers near you — DIY stores, builders merchants, tool hire, timber, tiles, plumbing, and more. One-tap directions.
Pro camera with zoom presets (0.5x, 1x, 3x), pinch-to-zoom, front/back switching, and three AI modes from one viewfinder.
Tailored for UK, USA, EU, and Australia. Region-specific regulations, local retailer pricing, and measurement unit support.
Save unlimited projects, track progress, and pick up where you left off. Rename, organise by room, and manage from your profile.
From problem to solution in under a minute.
Type what you want to do, use voice, or snap a photo. "Tile my bathroom wall", "fix this leaking tap" — anything goes.
AI analyses your project and builds a complete plan: steps, tools, materials, cost estimate, difficulty and time.
Follow each step with detailed instructions, visual guides and safety tips. Track progress and complete like a pro.
Start with a 7-day free trial. Upgrade or cancel anytime.
Download DIWAI and let AI be your DIY assistant.